What are the recommended safety precautions when installing IBS FIBRE® Flex sheets?
Ensure to work in a well-ventilated area, use dust masks and eye protection when cutting or sanding the sheets. Follow all safety guidelines provided in the technical literature.
How should IBS FIBRE® Flex sheets be stored prior to installation?
Store the sheets flat and off the ground in a dry, covered area to prevent warping and damage.
What tools and materials are required for the installation of IBS FIBRE® Flex sheets?
You will need standard carpentry tools, including a high-speed cutting tool, drill, screws or nails, tape measure, level, and appropriate personal protective equipment.
Can IBS FIBRE® Flex sheets be painted, and if so, what type of paint should be used?
Yes, IBS FIBRE® Flex sheets can be painted. Use a high-quality, exterior-grade acrylic paint suitable for cement-based materials.
What are the guidelines for cutting and drilling IBS FIBRE® Flex sheets to ensure durability?
Use a carbide-tipped blade for cutting and pre-drill holes for fasteners to prevent cracking. Follow the manufacturer’s guidelines for specific cutting and drilling instructions.
How do you ensure proper alignment and spacing when installing IBS FIBRE® Flex sheets Use a chalk line or laser level to mark guidelines on the substrate. Maintain the recommended gap between sheets for expansion and contraction, as specified in the installation guide.
What are the best practices for sealing and waterproofing IBS FIBRE® Flex sheets in outdoor installations?
Apply a waterproof membrane or sealant as recommended in the technical literature, especially in areas exposed to moisture. Ensure that tops of balustrades and parapets have a minimum 5° slope and are waterproofed according to the guidelines .
Are there any specific environmental conditions to consider when installing IBS FIBRE® Flex sheets?
Consider the local climate, such as humidity and temperature, and follow the manufacturer’s guidelines for installation in various environmental conditions.
How do you handle and dispose of waste materials during the installation of IBS FIBRE® Flex sheets?
Collect offcuts and dust in a designated area and dispose of them according to local regulations. Avoid creating dust and dispose of waste responsibly.
What maintenance is required after the installation of IBS FIBRE® Flex sheets to ensure longevity?
Regularly inspect the sheets for any signs of damage or wear. Clean the surface with mild soap and water, and touch up paint as needed to maintain the protective coating.